<Spec id="475" path="\5\0\50cda7638903011566bb53e948f0380a.pdf"><Text id="82975" page="8">COMPANY Std. Title</Text><Text id="82984" page="13">44 Pulsation and Vibration</Text><Text id="82986" page="14">59 Material inspection KP0-00-QAC-SPC-00001</Text><Text id="82987" page="14">60 Flanges ASME B16.5 |=|</Text><Text id="82988" page="1">Document owner: Engineering &amp; Technical Authority Manager</Text><Text id="82990" page="1">Functional Specification for the</Text><Text id="82991" page="1">Multiphase Pump at RMS-H</Text><Text id="82992" page="1">DOCUMENT No: KPO-10-MRE-SPC-00003-E</Text><Text id="82993" page="1">This is an uncontrolled copy unless it is being viewed on screen from the KPO Intranet.</Text><Text id="82998" page="1">A2 OA / AG</Text><Text id="82999" page="1">A1 OA / AG</Text><Text id="83000" page="7">WORK All the activities, accessories and equipment, necessary to cover the CONTRACTOR’s scope of work MAY Is used to indicate alternatives, which are equally acceptable, at</Text><Text id="83002" page="7">SHOULD Is used to indicate that the provision is preferred.</Text><Text id="83003" page="7">SHALL Is used to indicate a mandatory requirement</Text><Text id="83004" page="7">ALARP As Low as Reasonably Practical ANSI American National Standards Institute</Text><Text id="83005" page="7">API American Petroleum Institute</Text><Text id="83006" page="7">ASME American Society of Mechanical Engineers</Text><Text id="83007" page="7">ASTM American Society for Testing and Materials</Text><Text id="83008" page="7">BL Battery Limits</Text><Text id="83009" page="7">BS British Standard</Text><Text id="83010" page="7">CW Cooling Water</Text><Text id="83011" page="7">EAC Eurasian Customs</Text><Text id="83012" page="7">EN European Norm</Text><Text id="83013" page="7">ESD Emergency Shutdown System</Text><Text id="83014" page="7">FEED Front-End Engineering Design</Text><Text id="83015" page="7">FERA Fire, Explosion &amp; Radiation Assessment</Text><Text id="83016" page="7">F&amp;G Fire and Gas Systems</Text><Text id="83017" page="7">GOST Gosudarstvennyy Standart</Text><Text id="83018" page="7">HAZID Hazard Identification</Text><Text id="83019" page="13">30 NPIPa HOLD</Text><Text id="83020" page="13">31 Suction pressure 60 barG</Text><Text id="83021" page="13">32 Discharge pressure 87 barG</Text><Text id="83022" page="13">33 Differential pressure 27 bar</Text><Text id="83023" page="13">34 Settle out pressure HOLD Note 19</Text><Text id="83024" page="13">35 Pumping temperature 28 to 36°C</Text><Text id="83025" page="13">36 Discharge temperature 40°C Pump design temperature 95°C</Text><Text id="83026" page="13">37 Pressure rating 1500# Suction shall be rated the same as discharge |=|</Text><Text id="83027" page="13">38 Pump performance</Text><Text id="83028" page="13">Testing as per HI 3.6, tolerances as per API 676. testing tolerances</Text><Text id="83029" page="13">39 Suction Strainer Duplex basket type strainer with PDT and auto-changeover valves. Strainer shall be 400 microns</Text><Text id="83030" page="13">40 Mechanical seals Type ES - Cartridge Dual mechanical seals as per API sealing plan 54 complete with closed loop seal oil system.</Text><Text id="83031" page="13">41 Barrier Fluid Chevron TEGRA 5 Cst or 17Cst synthetic oil (HOLD) |=|</Text><Text id="83032" page="13">42 Lube Oil Closed loop lube oil system with tank, level transmitter and heater</Text><Text id="83033" page="13">API 614 Chapter 3</Text><Text id="83034" page="13">43 Vibration monitoring</Text><Text id="83035" page="13">Hardware as per BN Orbit 60 system</Text><Text id="83036" page="23">SUPPLIER shall determine pressure vessel maximum allowable working pressure (MAWP) by calculation in accordance with ASME VIII Div. 1 Para. UG-98. The MAWP at design temperature shall be shown on the pressure vessel nameplate.</Text><Text id="83037" page="23">4.9 Air-Cooled Heat Exchangers All air-cooled heat exchangers shall be designed, fabricated and tested by the SUPPLIER to manufacturer standard, however the fans shall be in 2 x 100 % configuration.</Text><Text id="83038" page="23">The Supplier SHALL provide all necessary structural steel (e.g., base frames) and all necessary platforms, handrails, and ladders to facilitate operation and maintenance, in accordance with the requirements of the following specifications:</Text><Text id="83039" page="23">• “Specification. Basic Civil Engineering Design Data”, doc. nr. KPO-00-CVS-SPC- 00006, to be used as basic civil and structural design criteria and input data;</Text><Text id="83040" page="23">• Specification for Materials, Fabrication &amp; Erection of Structural Steelwork doc. nr. KPO- 00-CVS-SPC-00005-ER.</Text><Text id="83041" page="23">Instrumentation, Control and safeguarding SHALL be in accordance with C&amp;I Specifications and philosophies KPO-00-INS-SPC-00009-E, KPO-00-INS-PHL-00002 &amp; KPO-00-INS-PHL-</Text><Text id="83042" page="23">00003 and documents cross-referenced therein.</Text><Text id="83043" page="24">Instrumentation shall be based upon well know manufactures such as Emerson, Fisher</Text><Text id="83044" page="24">Rosemount and ABB. All instrument must be registered for use in Kazakhstan metrology system and have EAC and CU TR certificates. hardwired and serial interfaces to allow connection to the main plant DCS, ESD and F&amp;G</Text><Text id="83045" page="24">Systems. An HMI and controls shall be provided in the package container to allow local operation when required. A local/remote switch shall be provided to allow for switching between local and remote operation.</Text><Text id="83046" page="24">For additional safeguarding, refer to the following table:</Text><Text id="83047" page="7">PTU Permit to Use</Text><Text id="83048" page="1">Rev Purpose Date Prepared Checked Approved</Text><Text id="83050" page="6">Several initiatives to improve liquid production were studied as part of the COMPANY Wells</Text><Text id="83051" page="6">&amp; Gathering Network Strategy. One of the outcomes identified the use of Multiphase Pumps at the remote manifold stations (RMS). This project builds on opportunity to increase production by lowering selected RMS operating pressure; thus, reducing backpressure on individual wells. As a result, the RMS low-pressure well fluids will require additional pressure boost into the gathering network, units and plant inlet manifolds.</Text><Text id="83052" page="6">The use of Multiphase pumps has been proposed to deliver this boosting requirement and it is intended to deliver RMS Multiphase Pump installation which can be safely operated and integrated into COMPANY operations framework. Multiphase pumping technology allows to draw down the flowing wellhead pressure while at the same time boosting the pressure to overcome the downstream backpressure. Low pressure wells and previously shut-in wells can be brought back to production without separation, flaring or venting.</Text><Text id="83053" page="6">It is essential to COMPANY ongoing business strategy to modify these low production/shut- in wells to overcome network pressure and maintain ongoing future production.</Text><Text id="83054" page="6">1.2 Purpose and Scope The purpose of this Functional Specification, in conjunction with all referenced documents, is to define the minimum requirements for the design, materials, fabrication, assembly, inspection, testing, painting and supply of the Multiphase Pump for KPO as part of the Project</Text><Text id="83055" page="6">“Multiphase Pump at RMS-H”.</Text><Text id="83056" page="6">MAIN ITEM SERVICE</Text><Text id="83057" page="6">1H-1300-PB-01 Multiphase Pump (MPP) at RMS-H</Text><Text id="83058" page="6">1.3 Definitions The following definitions are generic to the PROJECT and MAY not be referred to in this document:</Text><Text id="83059" page="6">COMPANY Karachaganak Petroleum Operating (KPO) B.V.</Text><Text id="83060" page="6">CONTRACTOR The CONTRACTOR is the party that carries out all or part of the design, engineering, procurement, construction, commissioning or management of a project or operation/maintenance of a facility.</Text><Text id="83061" page="6">SUPPLIER Organization supplying equipment, materials or services. CONTRACT The agreement by and between COMPANY and CONTRACTOR constituted by the contract documents</Text><Text id="83062" page="7">HAZOP Hazard and Operability study</Text><Text id="83063" page="7">HMI Human Machine Interface</Text><Text id="83064" page="7">HSE Health, Safety and Environment</Text><Text id="83065" page="7">HVAC Heating, Ventilation &amp; Air-Conditioning</Text><Text id="83066" page="7">KPC Karachaganak Processing Complex</Text><Text id="83067" page="7">KPO Karachaganak Petroleum Operating B.V.</Text><Text id="83068" page="7">ICCS Integrated Control and Safety System</Text><Text id="83069" page="7">IDS Inspection Data Sheet</Text><Text id="83070" page="7">IEC International Electrotechnical Commission</Text><Text id="83071" page="7">LCP Local Control Panel</Text><Text id="83072" page="7">LV Low Voltage</Text><Text id="83073" page="7">MMS Machine Monitoring System</Text><Text id="83074" page="7">MCC Motor Control Centre</Text><Text id="83075" page="7">MPP Multiphase Pump</Text><Text id="83076" page="7">MV Medium Voltage NACE National Association of Corrosion Engineers</Text><Text id="83077" page="7">NDE Non-Destructive Examination NFPA National Fire Protection Association</Text><Text id="83078" page="7">NPIPa Net Positive Inlet Pressure available</Text><Text id="83079" page="7">O&amp;M Operation &amp; Maintenance</Text><Text id="83080" page="7">PDT Pressure Differential Transmitter</Text><Text id="83081" page="7">PFP Passive Fire Protection</Text><Text id="83082" page="7">PLC Programmable Logic Controller</Text><Text id="83083" page="7">P&amp;ID Piping and Instrumentation Diagram</Text><Text id="83084" page="7">PMI Positive Material Identification</Text><Text id="83085" page="7">PQR Procedure Qualification Record</Text><Text id="83086" page="7">PSV Pressure Safety Valve</Text><Text id="83087" page="8">PWHT RoK SDRL SDV RMS SIL SIS SLD SOW TDS</Text><Text id="83088" page="8">TR CU UCP UPS VFD</Text><Text id="83089" page="8">Post Weld Heat Treatment</Text><Text id="83090" page="8">Republic of Kazakhstan</Text><Text id="83092" page="8">Remote Manifold Station</Text><Text id="83093" page="8">Safety Integrity Level</Text><Text id="83094" page="8">Safety Instrumented System</Text><Text id="83095" page="8">Single Line Diagram</Text><Text id="83096" page="8">Scope of Work</Text><Text id="83097" page="8">Technical Data Sheet / Mechanical Data Sheet Technical Regulation of Customs Union</Text><Text id="83098" page="8">Unit Control Panel</Text><Text id="83099" page="8">Uninterrupted Power Supply</Text><Text id="83100" page="8">Variable Frequency Drive</Text><Text id="83101" page="8">1.5 Order of Precedence The order of precedence applicable for use of the Codes, Standards, Specifications and</Text><Text id="83102" page="8">The COMPANY Standards library is mentioned in the following document.</Text><Text id="83103" page="8">Regulatory requirements in the event of an inconsistency, conflict or discrepancy between any of the Standards, Specifications and Regulations for this project is as follows:</Text><Text id="83104" page="8">• Legislation and Regulatory Requirements of the Republic of Kazakhstan</Text><Text id="83105" page="8">• Republic of Kazakhstan Code and Standards (RoK)</Text><Text id="83106" page="8">• Project Functional Specification</Text><Text id="83107" page="8">• Project Data Sheets</Text><Text id="83108" page="8">• Project Specifications</Text><Text id="83109" page="8">• COMPANY Specifications and Standards</Text><Text id="83110" page="8">• International Codes and Standards</Text><Text id="83111" page="8">In the event of an inconsistency, conflict or discrepancy between any of the Standards,</Text><Text id="83112" page="8">Specifications and Regulations, the most stringent and safest requirement applicable to the project SHALL prevail to the extent of the inconsistency, conflict or discrepancy. Any inconsistencies critical to the design SHALL be brought to the attention of the COMPANY for resolution. In all instances, the latest version of each standard SHALL be used.</Text><Text id="83113" page="8">Mechanical Data Sheet for Multiphase Pump (MPP) at RMS-H item 1H-1300-PB-01 Document will follow on next project phase</Text><Text id="83114" page="9">The main applicable International Standards are the following.</Text><Text id="83115" page="9">The design, construction and installation of the package shall comply with the relevant RoK</Text><Text id="83116" page="9">Codes and Standards. Where applicable RoK standards do not exist or cannot be applied, other industry recognized international standard and recommended practice, such as those from ASME, API or ISO, may be used following appropriate approval process. Latest revisions of the current Eurasian Customs Union Technical Regulations are mandatory and shall apply, but are not limited to the following regulations, where applicable:</Text><Text id="83117" page="9">TR CU 004 Low Voltage</Text><Text id="83118" page="9">TR CU 010 Machinery Safety</Text><Text id="83119" page="9">TR CU 012 Safety of Equipment for use within explosive atmospheres</Text><Text id="83120" page="9">TR CU 020 Electromagnetic Compatibility</Text><Text id="83121" page="9">TR CU 032 Pressure Equipment</Text><Text id="83122" page="9">Equipment or design requirements not covered by the TR CU Regulations shall continue to comply with the remaining applicable GOST regulations.</Text><Text id="83123" page="10">1.8 Language English and Russian language SHALL be used for all documents and drawings.</Text><Text id="83124" page="11">The description and the requirements contained in this specification are inevitably concise and cannot cover all the details relating to the supply. It is, however, understood that the supply</Text><Text id="83125" page="11">SHALL include all the necessary accessories required for an industrial continuous operation according to the criteria of good engineering, strictly adhering to the requirements. All items listed in Section 3 SHALL be supplied by SUPPLIER, unless it is specifically reported under the section “Exclusions” (section 3.3).</Text><Text id="83126" page="11">2.2 Supplier Responsibility The SUPPLIER SHALL have the sole responsibility for complete scope of supply including all auxiliaries. The goods SHALL be designed (including provision of information and guidance related to preservation, lifting, handling, transportation, installation, pre-commissioning, commissioning, start up, maintenance and repair), manufactured, assembled, inspected, tested, certified, preserved and supplied in compliance with all the attached and referenced documentation, and with the Codes, Standards and Specifications to which they refer.</Text><Text id="83127" page="11">Compliance with this condition SHALL not relieve the SUPPLIER of the responsibility to supply goods which are safe, reliable and fit for the intended purpose.</Text><Text id="83128" page="11">SUPPLIER SHALL have proven experience of supplying machines and systems for use in similar applications performing satisfactorily. To qualify, the SUPPLIER must have manufactured at least three comparable units:</Text><Text id="83129" page="11">• similar type, size and specific class</Text><Text id="83130" page="11">• comparable design pressure and flowrate</Text><Text id="83131" page="11">• minimum ambient design temperature -45°C.</Text><Text id="83132" page="11">SUPPLIER is required to be fully compliant with the local legislations.</Text><Text id="83133" page="11">SUPPLIER’s requirements to meet specific internationally accepted codes are listed under the appropriate sections of this specification. The SUPPLIER’s proposal SHOULD list other codes and standards to which their proposed equipment complies.</Text><Text id="83144" page="12">IP 56 - Electrical motor to be suitable for VFD application</Text><Text id="83145" page="12">- Pump package in Zone 2, Gas Group IIA, IIB, Temperature Class</Text><Text id="83147" page="12">- Control cabin in non-Hazardous area |=|</Text><Text id="83151" page="12">- H2S Content % wt.: 1.58 - 2.2; average 1.9</Text><Text id="83152" page="12">- Chloride Content mg/l: 1500 - 3200; average 2857.76</Text><Text id="83153" page="12">- CO2 Content % wt: 1.08 - 1.22; average 1.12</Text><Text id="83154" page="12">- Wax present</Text><Text id="83155" page="12">- Possibility of slugs.</Text><Text id="83159" page="12">5000 Am3/h (VTC)</Text><Text id="83162" page="12">25 Gas flow rate 6.36 to 7.129 MSm3/d (see Attachment 1)</Text><Text id="83163" page="13">26 Density Oil/Condensate: 709.4 to 728; Gas: 0.8773 to 0.8736;</Text><Text id="83164" page="13">27 Heat Capacity Oil/Condensate: 2.103 to 2.125; Gas: 2.398 to 2.430;</Text><Text id="83165" page="13">28 Water cut 0 to 20 % max</Text><Text id="83166" page="13">29 GVF 100 % liquid to 97% GVF</Text><Text id="83167" page="13">Assessment of any small- bore piping. Refer note-12 for Multiphase Pump Skids</Text><Text id="83168" page="13">45 Shelter with climate</Text><Text id="83169" page="13">Excluded from scope of supply (By PURCHASER) control</Text><Text id="83170" page="13">46 Pressure Safety Valve PSV routed to suction of the pump [=]</Text><Text id="83171" page="13">47 Coupling Special purpose coupling with non-sparking coupling guard</Text><Text id="83172" page="13">48 Balancing class for ISO 1940 Grade 2.5 rotors and coupling</Text><Text id="83173" page="13">49 Shut Down Valves Fire safe inlet and outlet SDV&apos;s ball valve type (failed closed)</Text><Text id="83174" page="13">Bypass quick opening SDV (from discharge to suction) - failed open</Text><Text id="83175" page="13">50 Liquid re-cycle For slug flow possibility. Refer note-17</Text><Text id="83176" page="13">51 Pump materials - Min metal design temperature: -45°C</Text><Text id="83177" page="13">- Pump casing Low Temperature Carbon Steel</Text><Text id="83178" page="13">- Pump shaft Alloy 625 or Alloy 718 &lt;=|</Text><Text id="83179" page="13">- Screws Alloy 625 Silicon carbide coating</Text><Text id="83180" page="13">- Replaceable liner ASTM A439 Silicon carbide coating</Text><Text id="83181" page="13">- Elastomers Elasto-O-Lion 101 (James Walker)</Text><Text id="83182" page="13">- Mechanical seals HASTEALLOY C276</Text><Text id="83183" page="14">- Site Acceptance Test of the complete unit</Text><Text id="83184" page="13">52 Timing Gears ISO 6336 Class 6 with a minimum SF of 2</Text><Text id="83185" page="13">53 Piping Specifications F11 ref. KPO-00-PIP-SPC-00003-E “Piping Material Classes” |g)</Text><Text id="83186" page="14">Note that a transition spool must be provided at the MPP suction and discharge since the MPP is only 1500# rated and F11 pipe i= spec is a 2500# spec.</Text><Text id="83187" page="14">54 Make of mechanical seal John Crane / Eagle Burgmann / Flowserve</Text><Text id="83188" page="14">55 Make of Coupling John Crane / Flender Graffenstaden</Text><Text id="83189" page="14">56 Instrumentation Including and not limited to: Industry Standard Segregated Control</Text><Text id="83190" page="14">&amp; Safety PLCs, Operator LCP/HMI, Laptop and Licenses, control and Safety Field Instrumentation and F&amp;G detection as required to operate the Package in a safe and efficient manner. The instrumentation will include two (2) pressure transmitters on the pump suction and discharge configured in voting logic of 1oo2.</Text><Text id="83191" page="14">58 Welding KP0-00-ENG-SPC-00005</Text><Text id="83192" page="14">Hardwired and Industry Standard Serial Interfaces shall be provided connect into the existing plant ICSS. See section 4.9 for further information.</Text><Text id="83193" page="14">Clamp on type instrumentation is acceptable for the non-critical circuits.</Text><Text id="83194" page="14">57 Pump Testing at works - Hydrostatic pressure test as per API 676</Text><Text id="83195" page="14">- Mechanical running test with 97% gas for 4 hrs. (witnessed) (=1</Text><Text id="83196" page="14">- Dry running test with 100% gas as per API 676 (witnessed) |=|</Text><Text id="83197" page="14">- Pump performance test as per API 676 (witnessed)</Text><Text id="83198" page="14">- Noise and vibration test (witnessed)</Text><Text id="83199" page="14">- Functional acceptance test which includes verification of functionality of instrumentation, control, PLC control logic, alarm and shutdown set points.</Text><Text id="83200" page="14">- Manufacturer standard motor and VFD test as per IEC standards.</Text><Text id="83201" page="14">- The pump shall be tested at speeds within five (5) percentage points of 30, 60, 90 and 100 % of rated speed. &lt;=]</Text><Text id="83202" page="14">- High discharge pressure test to test that the pump does no^eize</Text><Text id="83203" page="14">under these conditions. [=|</Text><Text id="83204" page="14">- Factory Acceptance Tesror the complete unit</Text><Text id="83205" page="14">61 Electric Motor Induction motor suitable for variable speed drive.</Text><Text id="83206" page="14">62 VFD Included</Text><Text id="83207" page="14">63 Lifting devices Third party certified spreader bar and shackles</Text><Text id="83208" page="14">64 Control System MPP operation shall be unmanned and remotely controlled from KPC.</Text><Text id="83209" page="14">65 Special tools Nitrogen charging kit for the accumulator.</Text><Text id="83210" page="14">Any special tools for maintenance of the pump package (^|</Text><Text id="83211" page="14">66 Commissioning and start-up Spares</Text><Text id="83212" page="14">67 Spare Parts for 2 years operation</Text><Text id="83213" page="14">68 Capital / Insurance spares</Text><Text id="83215" page="14">70 Fire fighting Excluded.</Text><Text id="83216" page="14">71 Fluid for Flushing during Diesel commissioning</Text><Text id="83217" page="14">Quote to be submitted separately</Text><Text id="83218" page="14">To be recommended by the pump vendor.</Text><Text id="83219" page="16">• Variable frequency drive system (VFD).</Text><Text id="83221" page="15">1) The pump shall be capable of start-up at settle out conditions.</Text><Text id="83222" page="15">2) Vendor shall furnish filled in API 676 data sheets. [==|</Text><Text id="83223" page="15">3) The suction and discharge of the pump shall be designed for the same rating. All connection for auxiliaries shall be suitable for the Max allowable working pressure.</Text><Text id="83224" page="15">4) The pump vent connection may be omitted if the pump is made self-venting by the arrangement of nozzles.</Text><Text id="83225" page="15">5) Replaceable liners shall be provided for the pump.</Text><Text id="83226" page="15">6) The rotor stiffness shall be adequate to prevent contact between the rotor bodies, the casing and gear timed rotor bodies at all the specified conditions.</Text><Text id="83227" page="15">7) The maximum seal leakage rates for the barrier fluid within the mechanical seal system shall be provided.</Text><Text id="83228" page="15">8) The pressure lubrication system for lube oil shall conform to API 614. 1^1</Text><Text id="83229" page="16">• Flexible coupling with non-sparking guard.</Text><Text id="83230" page="15">9) Reduced hardness materials shall be provided for pressure casing, shafting, pressure retaining seal components (excluding seal faces) and wet bolting.</Text><Text id="83231" page="15">10) ASME BPVC Section VIII Division 1 shall apply for impact-testing requirements.</Text><Text id="83232" page="15">11) The skid baseplate shall be designed to facilitate the use of optical, laser-based instrument for accurate levelling in the field.</Text><Text id="83233" page="15">12) Small bore piping shall be gusseted in two orthogonal planes to increase the rigidity of the piped connection.</Text><Text id="83234" page="15">13) Fit-up and assembly of machine mounted piping shall be completed in the vendor&apos;s shop prior to shipment.</Text><Text id="83235" page="15">14) Air cooler shall be manufacturer standard however the fans shall be in 2 x 100 % configuration.</Text><Text id="83236" page="15">15) Uptime factor for the pump shall be 0.9 with 25 days field turnaround applied once every</Text><Text id="83238" page="15">16) The equipment, its auxiliaries and the driven equipment shall be provided to meet the required level of 85 dB(A).</Text><Text id="83239" page="15">17) Re-cycle line shall be provided which shall be connected back to suction.</Text><Text id="83240" page="15">18) Clamp type piping supports shall be used within the pump package.</Text><Text id="83241" page="15">19) As per the average of discharge high pressure trip (150 barG) and suction high- pressure trip (100 barG), the settle out pressure is estimated to be 125 barG. Bidder to check and</Text><Text id="83247" page="16">26) revert back if this causes un-necessary oversizing of the pump driver and integrity issues for pump mechanical seals. HOLD</Text><Text id="83248" page="16">Pump vendor shall indicate the NPSHr for the selected model.</Text><Text id="83249" page="16">Strainer upstream of the pump may require steam-out typically 1 bara and 160°C. 2” nozzle shall be provided at the base of the vessel for utility connection.</Text><Text id="83250" page="16">• 1 (one) multiphase twin screw pump with external timing gears according to API 676.</Text><Text id="83251" page="16">• MPP electric motor.</Text><Text id="83252" page="16">The following materials are not permitted for components in contact with sour service. UNS S17400 (17-4 PH Stainless Steel), ASTM A564 Grade 630, UNS S15500 (15-5 PH @</Text><Text id="83253" page="16">Stainless Steel), Stainless Steels 304/321/347 grades and other non-Mo containing austenitic grades, Martensitic Stainless Steels (13% Cr, UNS S41426, F6A, CA6NM, UNS S42400, F6NM), UNS S45000 (Custom 450), Austenitic Ferritic Stainless Steel</Text><Text id="83254" page="16">(2205, 2507, F51, 44LN, UNS S31803, UNS S32760), UNS N07750, Nickel Alloy X750,</Text><Text id="83255" page="16">Copper based alloys.</Text><Text id="83256" page="16">3D model shall be developed for the package for PURCHASER review after the placement of PO as a deliverable.</Text><Text id="83257" page="16">Pump vendor shall review and comment on the purchaser’s foundation and piping |=] drawings during the engineering phase after placement of PO.</Text><Text id="83258" page="16">Transmitters for machinery protection shall be distinct and separate from instruments for machinery diagnostics and monitoring.</Text><Text id="83259" page="16">Non-skid metal decking covering all walk and work areas shall be provided on the top of the baseplate.</Text><Text id="83260" page="16">The Multiphase Pump package scope of supply SHALL mainly consist of, but not limited to:</Text><Text id="83261" page="16">• Lube oil / Seal oil system for pump and electric motor. o Two (1 working + 1 standby) auxiliary electric motor-driven oil pumps. o One lube oil electric heater with thermostat. o Lube oil air cooler with redundancy in number of fans. o One oil twin filter with separate transfer valves. o One PCV in Lube Oil console, which control outlet pressure by bypassing extra flow back to the crankcase. o Flow transmitter o Level transmitter.</Text><Text id="83262" page="17">• Vents and drains piped up to skid edge, provided with valves and flanges.</Text><Text id="83263" page="17">• 316L stainless-steel lube oil piping upstream and downstream oil filters.</Text><Text id="83264" page="17">• Suction strainer in duplex configuration with spool pieces.</Text><Text id="83265" page="17">• Double mechanical seal.</Text><Text id="83266" page="17">• Liquid Injection Skid (Vendor to confirm). ••</Text><Text id="83271" page="17">•• •• ••</Text><Text id="83273" page="17">•• •• o Temperature and pressure transmitters</Text><Text id="83274" page="17">Skids for multiphase pump, motor and lubricating system with drip pan including a flanged and valved drain, anchor bolts design and template, shim packs for vertical alignment or vertical jack screws for the installation.</Text><Text id="83275" page="17">Separate baseplate for piping skid. Suction and discharge piping to the skid edge, including: o FSC (Fail Safe Close) Shut Down Ball Valves with spring return electro / hydraulic actuators. o Pressure Safety Valve o Check Valve in the discharge piping. o Monitoring and Control Instrumentations including wiring to the junction boxes on the piping skid.</Text><Text id="83276" page="17">The counter-flanges on the battery limits with the existing facilities shall match 2500# class. Process and auxiliaries interconnecting piping between the equipment inside the skid and any auxiliary skids, including thermal expansion joints, valves, supports and brackets, etc.</Text><Text id="83277" page="17">Bulk materials necessary for the complete installation at site of the equipment, including but not limited to manual valves, fittings, flanges &amp; blind flanges, gaskets, bolts and tie rods, vents &amp; drain assemblies, supports, fixing systems during transport. All the necessary instrumentation with vibration monitoring. Electrical components. Electrical cables and instrument cables inside the skid until the junction box within the machinery/equipment battery limits. Cable tray, conduit, and Junction Boxes with interface terminal strips inside the skid. Junction boxes SHALL be segregated in function of signal type and working voltages and located at skid battery limits.</Text><Text id="83278" page="17">Certified spreader bar with slings for lifting of the heavy components. Unit Control Panel (UCP); Type P3 PLC-based, redundant type, included in a dedicated Container, complying with KP0-00-INS-SPC-00017-E - Instrument Cabinet</Text><Text id="83279" page="17">Specification section 5.</Text><Text id="83280" page="18">• Complete Machine Monitoring System (MMS) and relevant probe(s) for detection and monitoring of vibration/temperature for the pump and motor bearings and for winding temperature, compliant with KP0-00-INS-SPC-00016-E - Machine Condition</Text><Text id="83281" page="18">Monitoring System Specification.</Text><Text id="83282" page="18">• Stair, ladders and service platform for cabinet access (if required).</Text><Text id="83283" page="18">• Provision for heat tracing installation on supplied items.</Text><Text id="83284" page="18">• Special tools and wrenches.</Text><Text id="83285" page="18">• Certified Lifting lugs.</Text><Text id="83286" page="18">• Painting of piping / equipment / steel structure.</Text><Text id="83287" page="18">• Commissioning and Start Up spare parts (included).</Text><Text id="83288" page="18">• Two (2) years spare parts (listed)</Text><Text id="83289" page="18">• Capital spare parts (listed)</Text><Text id="83290" page="18">• Engineering services as required in the relevant paragraphs;</Text><Text id="83291" page="18">• Technical documentation as per dedicated section of this document.</Text><Text id="83292" page="18">• Inspection and test as per dedicated section of this document.</Text><Text id="83293" page="18">• Packing, preparation for shipment and transportation</Text><Text id="83294" page="18">• Anchor bolts and packing for all foundation connections.</Text><Text id="83295" page="18">• Template for anchor bolt-holes.</Text><Text id="83296" page="18">• Equipment tagging and colour coding.</Text><Text id="83297" page="18">The followings are excluded from SUPPLIER scope of supply:</Text><Text id="83298" page="18">• Motor Control Centre (MCC)</Text><Text id="83299" page="18">• Civil works</Text><Text id="83301" page="18">• Pipe-work between package edge flanges and any separately installed equipment</Text><Text id="83302" page="18">• External piping outside package defined boundary.</Text><Text id="83303" page="18">• External power cables outside package defined boundary</Text><Text id="83304" page="18">• Erection and Installation.</Text><Text id="83305" page="18">• Shelter with climate control.</Text><Text id="83306" page="18">• Active fire protection.</Text><Text id="83307" page="18">• Electrically operated travelling hoist within the shelter.</Text><Text id="83308" page="18">3.4 Battery Limits For piping, the battery limit will be limited to the extension of the skid&apos;s baseplate.</Text><Text id="83309" page="18">The SUPPLIER SHALL include in its bid an outline drawing showing the battery limits of the supply in its scope. Minor adjustments of the battery limits during the PROJECT engineering</Text><Text id="83310" page="19">phase SHALL not affect the supply. Any adjustments of the battery limits SHALL be, in any case, subject to COMPANY Approval and SHALL not affect the scope of supply.</Text><Text id="83311" page="19">Piping connection at the battery limit of the skid SHALL be in accordance with PROJECT</Text><Text id="83312" page="19">Piping Material Class Specification KPO-00-PIP-SPC-00003-E.</Text><Text id="83313" page="19">The equipment SHALL be delivered pre-assembled to the maximum extent possible, ready for installation at the interface flanges. In case of more skids, the pipes between them SHALL be supplied in prefabricated spools duly tagged.</Text><Text id="83314" page="19">Finish coats, where required, SHALL be applied at the workshop before shipment.</Text><Text id="83315" page="20">The equipment SHALL be designed for reliability, maintainability and operating life as specified in this document. Package design SHALL be able to guarantee its continued integrity and ability to perform its required functions effectively and efficiently to achieve the business objectives, whilst safeguarding people, the environment and the COMPANY reputation for the entire lifecycle.</Text><Text id="83316" page="20">Process Engineering Design Criteria (KPO-00-ENG-PHL-00010) must be adhered to for MPP design. Below is the preliminary P&amp;ID of MPP for informational purposes only.</Text><Text id="83317" page="20">At the suction: A main ESDV is provided with a bypass allowing equalisation. A DPAHH will prevent the main ESDV to be open requiring the operator to open the bypass to equalise pressure and clearing DPAHH to open the main suction ESDV.</Text><Text id="83318" page="20">• A PAHH preventing the MPP to start if the suction pressure is too high. This effectively allows the discharge PSV to adequately protect the MPP discharge pipework by reducing the backpressure on the PSV when relief is initiated.</Text><Text id="83319" page="20">• A PIC controlling the MPP speed to maintain a pre-determined set point in the suction of the MPP.</Text><Text id="83320" page="20">At the discharge:</Text><Text id="83321" page="21">• A TAHH shutting the MPP down if excessive temperature is reached at the MPP discharge.</Text><Text id="83322" page="21">• A PAHH shutting the MPP down if excessive pressure is reached at the MPP discharge.</Text><Text id="83323" page="21">• A PSV to protect the MPP discharge pipework in a blocked outlet scenario.</Text><Text id="83324" page="21">• A check valve minimising the likelihood for reverse flow during normal operation.</Text><Text id="83325" page="21">• A main ESDV is provided with a bypass allowing equalisation. A DPAHH will prevent the main ESDV to be open requiring the operator to open the bypass to equalise pressure and clearing DPAHH to open the main suction ESDV.</Text><Text id="83326" page="21">The equipment SHALL meet the design parameters as stated in the section 3.1 “Basic Design</Text><Text id="83327" page="21">Data and Specifications” and COMPANY Technical Standards.</Text><Text id="83328" page="22">ASME B31.3, &apos;Process Piping&apos; code requirements and KPO Specification number KPO-00-</Text><Text id="83329" page="21">Auxiliary piping carrying external services and drains SHALL terminate at the package skid­ edge. A common terminal point complete with block valve SHALL be provided for each type of service.</Text><Text id="83330" page="21">All equipment SHALL be designed to withstand the external forces and moments. Equipment nozzle loading and connecting piping stress requirements SHALL be in accordance with</Text><Text id="83331" page="21">Piping Stress Analysis Procedure KPO-00-PIP-PRO-00001-ER.</Text><Text id="83332" page="21">All piping interface terminations shall be anchored at the skid edge. The anchors shall absorb the piping continuation loads.</Text><Text id="83333" page="21">Auxiliary pumps within the MPP package shall be rotary positive displacement type driven by electrical motors.</Text><Text id="83334" page="21">The pump will operate in an H2S environment. Materials selection shall be made based on the reference list relating to machines manufactured and operating under identical or similar services.</Text><Text id="83335" page="21">Materials, Welding and Non-Destructive Examination (NDE) of piping elements shall comply with requirements of Company Specifications nos. KPO-00-QAC-SPC-00001, &quot;Supplier Welding Procedure Approval &amp; Welding Quality Requirements&quot;, KPO-00-PIP-SPC-00008,</Text><Text id="83336" page="22">Div. 1 as amended by COMPANY document KPO-00-MVE-SPC-00001-E “Pressure Vessels”.</Text><Text id="83337" page="21">&quot;Specification for Piping, Forgings, Castings and Plate for Sour Service&quot; and KPO-00-ENG- SPC-00005, &quot;Welding, PWHT and NDE of Plant Piping and Equipment (Including Form 167)&quot;. Materials used for Mechanical Equipment and Piping shall comply with COMPANY specification: SUPPLIER / VENDOR may propose alternative materials as an option (as part of the package) provided that the materials are of suitable for process and/or of higher &quot;grade&quot; and offer an equivalent or better life. Any alternative material proposed is subject to specific approval by the COMPANY.</Text><Text id="83338" page="22">Minimum requirements have been set in the Section 3.1 “Basic Design Data and Specifications”.</Text><Text id="83339" page="22">4.5 Piping and Layout All piping materials shall be in accordance with COMPANY specification KPO-00-PIP-SPC-</Text><Text id="83340" page="22">00003- E “Piping Material Classes&quot;. Piping layout, design and flexibility analysis shall conform to COMPANY document no: KPO-00-ENG-SPC-00031 “Piping Design and Plant Layout”. The layout of piping shall take into account access and egress, constructability, simultaneous Operation (SIMOPS). Ease of access to all equipment and controls and escape routes shall be an integral part of the design.</Text><Text id="83341" page="22">4.6 Pipe Stress Analysis Requirements SUPPLIER / VENDOR shall carry out stress analysis of on-skid piping in accordance with</Text><Text id="83342" page="22">PIP-PRO-00001 Piping Stress Analysis Procedure. SUPPLIER / VENDOR shall ensure the piping loads on equipment nozzles shall meet the nozzle load criteria detailed in the relevant Company Specification and API 676.</Text><Text id="83343" page="22">All piping interface terminations shall be anchored at the skid edge by SUPPLIER / VENDOR.</Text><Text id="83344" page="22">The Anchors shall absorb the piping continuation loads.</Text><Text id="83345" page="22">If applicable, small-bore connections shall be designed in accordance with COMPANY specification KPO-AL-PIA-GLS-00003, &quot;Guidelines for assessment of vibration induced fatigue of process piping&quot;.</Text><Text id="83346" page="22">Materials, Welding and Non-Destructive Examination (NDE) of piping elements shall comply with requirements of Company Specifications nos. KPO-00-QAC-SPC-00001, &quot;Supplier Welding Procedure Approval &amp; Welding Quality Requirements&quot;, KPO-00-PIP-SPC-00008,</Text><Text id="83347" page="22">&quot;Specification for Piping, Forgings, Castings and Plate for Sour Service&quot; and KPO-00-ENG- SPC-00005, &quot;Welding, PWHT and NDE of Plant Piping and Equipment (Including Form 167)&quot;. Materials used for Mechanical Equipment and Piping shall comply with COMPANY specification: SUPPLIER / VENDOR may propose alternative materials as an option (as part of the package) provided that the materials are of suitable for process and/or of higher &quot;grade&quot; and offer an equivalent or better life. Any alternative material proposed is subject to specific approval by the COMPANY.</Text><Text id="83348" page="22">Design, fabrication and testing of vessels and columns shall be in accordance with ASME VIII</Text><Text id="83349" page="23">The MPP control system shall be based upon Allen Bradley SIL 2 redundant PLC with redundant Power supply and communication modules; as the number of I/O is minimum inclusive of F&amp;G detectors, a Hybrid solution is envisaged where PCS and ESD/F&amp;G can be combined in one PLC. Safeguarding functions shall be implemented in accordance with IEC 61511/61508. The control and safety systems shall provide hardwired and serial interfaces (Modbus TCP/IP) via</Text><Text id="83350" page="23">FO link to allow connection to the main plant DCS, ESD and F&amp;G Systems.</Text><Text id="83351" page="23">A door mounted colour 19&quot; HMI for monitoring and controls shall be provided in the control panel. The PLC control panel shall be installed inside a shelter HVAC controlled; adjacent shall be the panel for the VFD 6 Kv rated to control the MPP.</Text><Text id="83352" page="23">Interface between the PLC and VFD shall be hardwired and or Serial link TCP/IP Mod-bus.</Text><Text id="83353" page="23">VFD data shall be available at the PLC HMI and eventually in the main control room at the plant via FO cable. Standard control functions such local/remote, auto/manual are envisaged features, yet full philosophy shall be developed during detailed design.</Text><Text id="83354" page="24">For electrical requirements, refer to Technical Specification for electrical plants included in package supplies, Doc. No KPO-00-ELT-SPC-00018 and to Electrical Design Criteria, Doc.</Text><Text id="83356" page="24">For safety requirements, refer to Loss Prevention Basis of Design (KPO-00-ENG-PHL-00012-</Text><Text id="83357" page="24">E Rev A2). Any TSE deliverable produced shall be in accordance with KPO Risk Management</Text><Text id="83358" page="24">Requirements (RMR) and shall be discussed and approved by the PED TSE Lead. The SUPPLIER SHALL participate in a HAZOP and SIL studies for the equipment within their scope. The study will be conducted in accordance with KPO procedures.</Text><Text id="83359" page="25">The SUPPLIER is responsible for resolving / implementing ACTIONS resulting from the workshop relating to equipment in their scope. A follow-up review SHALL be performed to verify satisfactory completion.</Text><Text id="83360" page="25">Piping, equipment and structures SHALL be prepared, primed and finish painted in accordance with COMPANY Painting &amp; Coating Specification, doc no. KPO-00-ENG-SPC- 00035.</Text><Text id="83361" page="25">Insulation SHALL be provided in accordance with COMPANY Hot &amp; Cold Insulation</Text><Text id="83362" page="25">Specifications: KPO-00-PIP-SPC-00019 Specification for Cold Service Insulation and KPO-</Text><Text id="83363" page="25">00-PIP-SPC-00020 Hot Insulation for Piping, Tanks, Vessels and Equipment</Text><Text id="83364" page="25">Personnel protection SHALL be provided for any surfaces that exceed 60°C. Where this is not reasonably practical it SHALL be identified to COMPANY during detailed engineering for approval.</Text><Text id="83365" page="26">The equipment shall meet the guaranteed operating conditions/cases specified in Mechanical</Text><Text id="83366" page="26">Data Sheet for Multiphase Pump (MPP) at RMS-H (Document will follow on next project phase).</Text><Text id="83367" page="26">Performance test shall be executed at CONTRACTOR / VENDOR facility in presence of</Text><Text id="83368" page="26">COMPANY or of its representative. Procedures for all tests shall be submitted by</Text><Text id="83369" page="26">CONTRACTOR for review and approval by COMPANY as part of the proposal.</Text><Text id="83370" page="26">A Multiphase Fluid Mechanical Test (as per API 676) will ascertain the guaranteed performance. A fluid of defined GVF of 97%, simulating multiphase conditions, shall be introduced into the pumping system inlet during the test. Test stand conditions and acceptance criteria shall be agreed between CONTRACTOR/VENDOR and COMPANY at Technical Bid</Text><Text id="83371" page="26">Evaluation (TBE) phase.</Text><Text id="83372" page="26">A Dry Run Test (as per API 676) will confirm the performance when the GVF will rapidly change from 30% to 100% at pumping system inlet. Test stand conditions and acceptance criteria shall be agreed between CONTRACTOR/VENDOR and COMPANY at Technical Bid</Text><Text id="83373" page="26">Evaluation (TBE) phase.</Text><Text id="83374" page="27">SUPPLIER is requested to submit the following document list with bid. a) Filled in API 676 data sheet with torque-speed curves. b) Motor and VFD Data Sheet c) Noise Data Sheet d) Suction strainer data sheet and specifications. e) General Arrangement drawing with equipment weights including MTO list. f) Interface and Connection Schedule g) Utility / Effluent / Chemical Consumption List h) Flow diagram or sample P&amp;ID i) Fabrication/Production Schedule j) Typical Quality Plan k) Spare Parts List l) Sub-vendor list m) List of exclusions n) Standard deviation list to international standards o) Experience list where three (3) similar units have been supplied and operating satisfactorily.</Text><Text id="83375" page="28">A. Process Data for Pump Sizing</Text><Text id="83376" page="28">Process Data for</Text><Text id="83377" page="28">Pump Sizing v2.xlsx</Text><Text id="83379" page="1">OA Issued for Quotation RP 15/11/2024 Issued for Quotation PD RP 11/10/2024 29/08/2024 Issued for Quotation PD RP</Text><Text id="83380" page="2">Number Description Net Positive Inlet Pressure available (NPIPa) 1 2 Settle Out Pressure Barrier Fluid - Chevron TEGRA 5 cST or 17 cST 3</Text><Text id="83381" page="2">Revision Changes R1 Issued for Review A1 Issued for Quotation A2 Issued for Quotation - Strainer filtration level 400 microns, pump package shall be installed under a shelter with rigid foundation, fire protection, winterization, hoist excluded from pump vendor&apos;s scope. Skid dynamic analysis requirement deleted since the pump shall be mounted on a rigid foundation. Area classification is Zone 2, Gas Group IIA, IIB, Temperature Class T3 A3 Issued for Quotation - P&amp;ID revised. International standard for Centrifugal Pumps DELETED Shaft driven lube oil pump replaced with motor driven pump Mechanical seal plan 54. Seal material of construction specified. Material of construction for the pump shaft revised. Added note for materials that are not permitted. International standard for the gears updated to ISO with the corresponding class desired. Rotary Pump test standard HI 3.6 added. Non-skid metal decking added on top of the baseplate covering the walk and work areas. Casing temperature detection deleted.</Text><Text id="83382" page="3">Responsible Name: Ravindra Pai Job Title: Senior Packaged and Rotating Equipment Engineer Digitally signed by Pai, Ravindra Dayanand Signed: Pai, Ravindra Dayanand D^ &apos; ou=KPO-Users, “ cn=Pai, Ravindra Date: 2024.11.15 09:31:50 +05&apos;00&apos; Date: 15/10/24 Accountable Name: Oluwaseun Michael Awe Job Title: Lead Mechanical and Piping Engineer AL Digitally signed by Oluwaseun Awe Sifceduwaseun Awe Date: 2024.11.15 10:04:30 +05^ Date: Endorsed Name: Fabio Capece / Rahul Kumar Job Title: Engineering and Technical Authority Manager Signed: Date: Document Owner (if different from Endorsed) Consulted Name: John Mackay / Giorgio Cognigni Job Title: Technical Authority Manager Consulted PED Electrical PED Instrumentation PED Civil PED Process PED Piping DED Process Engineer PED Technical Authority Manager DED Lead Development Engineer Informed Name: Berkina Altyn / Andrei Sozinov Job Title: Lead Execution Engineer</Text><Text id="83383" page="9">International Standard International Standard Title ASME BPVC VIII Div 1 Rules for Construction of Pressure Vessels Division 1 ASME B.16 series Standards for Piping Pressure Piping Materials for use in H2S-containing environments in oil and gas production_________________________________________________ ASME B.31 series NACE MR0175 / ISO 15156 API 520 Pressure Relief Systems API 521 Pressure Relief and Depressurizing Systems Flanged Safety Relief Valves API 526 API 614 VDI 3836 Lubrication, Shaft-Sealing, and Control-Oil Systems and Auxiliaries Measurement and Evaluation of Mechanical Vibration of Screw Type Compressors and Roots Blowers_______________________________ Machinery Protection Systems API 670 Special Purpose Couplings API 671 Positive Displacement Pumps - Rotary API 676 API 682 Pumps - Shaft Sealing Systems for Centrifugal and Rotary Pumps HI 3.6 Rotary Pump Test ISO 9000 Quality management systems ISO 10816 Series ISO 10474 Mechanical Vibration - Evaluation of machine vibration by measurements on non-rotating parts.____________________________ Steel and steel products — Inspection documents EN 10204 IEC60529 ISO 3746 Metallic products Degrees of Protection Provided by Enclosures Acoustics - Determination of sound power levels of noise sources using sound pressure_____________________________________________</Text><Text id="83384" page="15">BS EN 10204 3.1 / CU-TR [pf] Certification 72 73 KP0-00-LGT-SPC-00001 Preservation during Transportation and Storage 74 Included Training</Text><Text id="83385" page="24">Trip Alarm Machine Parameter S No High 1 High High (2oo2 voting logic) Discharge Pressure Low 2 Low Low (2oo2 voting logic) Suction Pressure High High High (2oo2 voting logic) 3 Discharge temperature High High High (2oo2 voting logic) Suction temperature 4 Pressure Differential across the suction strainer 5 High High High Pressure Differential across the suction SDV 6 High Pressure Differential across the discharge SDV High 7 High High High High 8 Pump and Motor High Radial Vibration High Pump and Motor Bearing Temperature 9 High 10 High Loss of Barrier Pressure for API Plan 53/54 Lube Oil Pressure for pump and Motor 11 Low 12 Lube Oil / barrier fluid Tank Temperature High 13 Low Lube Oil Tank / barrier fluid Level Low 14 Lube Oil / barrier fluid flow Motor Winding Temperature High 15 16 Low Seal Oil Tank Level Seal Oil Pressure 17 Low 18 High High Fin-Fan Cooler Vibration High 19 Fire and Gas detection X X</Text><Text id="83388" page="20">MPP SKID | (NOTE 1)

    
 

 

NITROGEN SUPPLY
HOLD

‘

LIQUID INJECTION

RMS (DISCHARGE)
_ RMS (SUCTION)

 

 

NOTES:
1. MPP SKID (BETWEEN THE SUCTION AND DISCHARGE XVs MUST BE SHELTERED TO ENSURE THERMAL EXPANSION |S NOT A CREDIBLE CASE FOR MPP OVERPRESSURE.

2. SUCTION PIC CONTROLS THE SUCTION PRESSURE BY ADJUSTING THE MPP SPEED.

3. MPP SUCTION PAHH PREVENTS THE MPP TO START SHOULD THE PRESSURE EXCEED 100 BARG (HOLD) TO ENSURE THE BACKPRESSURE ON THE MPP DISCHARGE RELIEF VALVE DOES NOT EXCEED 40% OF THE RELIEF VALVE
SET PRESSURE TO ENSURE THE | RELIEF VALVE CAN ADEQUATELY RELIEF IF REQUIRED.

4. MPP DISCHARGE PAHH ACTIVATES THE OPENING OF THE MPP BYPASS XV ALLOWING To QUICKLY DISCHARGE THE MPP DISCHARGE BACK INTO THE SUCTION.</Text></Spec>