<?xml version="1.0" encoding="utf-8"?>
<Spec id="814" path="\b\c\bce6406c682b84b2e9987ec75f516528.pdf"><Text id="99321" page="9">This invitation to tender is a functional invitation to tender for automated storage/conveyor technology and the associated control technology based on joint planning by Client and Metroplan.</Text><Text id="100506" page="139">o The pallet lifts must be equipped with all necessary safety devices and barriers; in particular, the client&apos;s health and safety requirements attached to the tender must be taken into account.</Text><Text id="101766" page="272">The calculation has to be based on at least weekly project management and design meetings on-site or in the head office of the Client in Lodz, Poland. Weekly construction meetings are planned from the start of construction and assembly; the frequency may increase in case of important milestones or increased workload and critical scopes. The place for the meetings or discussions is, as required, on the construction site in Pyskowice, or in Łódź, depending on the purpose.</Text><Text id="149079" page="194">max. 380 storage totes / hour - Filled storage totes from robots to Picking Gallery: max. 380 storage totes / hour - Throughput turntable to rotage storage tote (assumption 10%): max. 100 storage totes / hour - Thoughput lifts for storage totes in manual</Text><Text id="149081" page="197">from there to the storage conveyor circuit in front of the rows of shelves of the automatic shuttle warehouse in the picking gallery (see figure 4-61, point &quot;2&quot;). The storage totes are transported to the individual rack aisles via this storage conveyor circuit. A vertical conveyor is planned in front of each rack aisle (see figure 4-61, point &quot;4&quot;, shown in turquoise), which then takes the storage totes from the accumulation lane in front of the vertical conveyor and transfers them to the short accumulation lanes per level in the rack</Text><Text id="149088" page="196">and servicing, the relevant conveyor technology components must be arranged above the workstations and at higher conveyor levels above the floor for easy access. The arrangement and accessibility of the relevant conveyor components must be agreed in detail by the Logistics Contractor</Text><Text id="152742" page="168">o The maximum height of a pallet is 2,200 mm, including pallet; the required opening for the conveyor system closure must be determined accordingly and the required opening size, the possible technical design / arrangement of the conveyor system closure on the fire wall must be actively and independently agreed with the Building Contractor.</Text><Text id="159875" page="168">Doors must be provided at suitable points in the fencing system to allow access for troubleshooting, maintenance and repairs.</Text><Text id="164961" page="21">The period of warranty is a minimum of 3 years and starts at the end of the trial operation / the acceptance of all deliveries and services by the Client. Warranty commences after full handover information is delivered to the Client (including CE certification for all installations separately and CE certification for the whole system).</Text><Text id="164962" page="21">The Logistics Contractor ensures, that all deliverables and services correspond to all relevant legal regulations as well as governmental terms and other conditions, based on Polish law.</Text><Text id="164963" page="21">During the warranty period the contractor is obliged to pay for all appeared faults, troubles and failures of his deliveries and services; the Logistics Contractor must arrange the immediately elimination of the faults, troubles and failures, if these cannot be repaired by the trained technical staff from the Client; the period of warranty is blocked from the input of the written notice of a defect up to the moment of its elimination.</Text></Spec>