<?xml version="1.0" encoding="utf-8"?>
<Spec id="893" path="\7\8\786bd663fdd24b93e7546077300ccffb.pdf"><Text id="152740" page="21">The period of warranty is a minimum of 3 years and starts at the end of the trial operation / the acceptance of all deliveries and services by the Client. Warranty commences after full handover information is delivered to the Client (including CE certification for all installations separately and CE certification for the whole system).</Text><Text id="152890" page="20">- Free removal of faults in all systems of the scope of delivery and services described, provided, if these cannot be remedied by the trained operating personnel during the warranty period after acceptance.</Text><Text id="153720" page="105">In principle, non-contact protective devices should be avoided wherever possible due to the high testing effort and space requirements (safety distances). Design measures such as monitored minimum speed, step mats etc. should be preferred.</Text><Text id="153721" page="105">All barriers must comply with the relevant accident prevention regulations and the guidelines for equipment and systems for storagce and retrieval PN-EN ISO 13857:2020 Safety od Machinery; they must not fall below a minimum height of 2,200 mm; the Health&amp;Safety regulation in the appendix are to be considered. To prevent unauthorised access to the rack aisles and the associated risk of accidents, the danger areas must be secured by barriers with electrically secured access / escape doors. When designing all lattice walls, it must be ensured that it is not possible to reach through. A minimum distance between the end limiters of the stacker cranes and the escape / access doors to the aisles must be provided as a safety space. Safety devices for repair and maintenance work on the equipment must be provided, such as safety ropes, steps and handrails.</Text><Text id="153723" page="105">The control unit aisles must be secured against the maintenance and escape aisles and against each other, so that if one aisle fails, the others can continue to be operated. Each access door must be fitted with a door contact in such a way that when the door is opened, the relevant lane is switched off (emergency stop). The doors can only be opened with the key with which the lane at the control panel itself is switched on and off (key switch), or different keys are inseparable at one collar. The keys of the individual lanes are not interchangeable. The doors must be designed as escape doors.</Text><Text id="153725" page="105">The detailed arrangement, execution and design of the escape and access doors as well as all safety devices must be coordinated in good time with the responsible authorities and offices (e.g. employers&apos; liability insurance association).</Text><Text id="153727" page="105">Particular attention must be paid to the areas of the storage and retrieval stitches with the stacker cranes transfer points for the aforementioned requirements.</Text><Text id="153728" page="105">The maintenance area is to be designed in such a way that trouble-free work on the stacker cranes is possible without being hindered by the shelving. The maintenance areas must be equipped with suspension devices for hoists for maintenance and repair purposes. The maintenance area shall provide unrestricted access to the undercarriage of the stacker cranes and to any other parts of the stacker cranes required for maintenance. It must be ensured that repair and maintenance work can also be carried out on the upper mast structures and upper guide rails. The execution and equipment of the maintenance areas must be coordinated with the Client within the framework of the execution planning.</Text><Text id="153729" page="105">An ascending ladder with the necessary safety precautions shall run along the entire mast length of the crane, via which the ascent and descent to the lift truck for maintenance purposes or for fault rectification is possible. An officially approved ascent / descent safety device must be provided to secure the person.</Text><Text id="153731" page="105">The Loigistics Contractor&apos;s scope of delivery and services includes all equipment for the design of the maintenance areas and safety equipment (incl. 1 safety harness per device).</Text><Text id="153757" page="116">The HBW has to be erected with 8 aisles and stacker cranes in a silo construction.</Text><Text id="156238" page="22">The same regulations apply to damages of properties and persons, which arise through carelessness or negligence of the personnel of the Logistics Contractor or his sub-contractor or in series insufficient security and safety measures at nearby standing machines and operating equipment.</Text><Text id="156244" page="22">Supplies and services are accepted by the Client after complete realisation of the deliverables without any damage. If any damage of all type occurs anywhere on site as well as on the streets, public drains, removal pipework etc., all cost shall be borne by the contractor.</Text><Text id="156245" page="21">The period of warranty is a minimum of 3 years and starts at the end of the trial operation / the acceptance of all deliveries and services by the Client. Warranty commences after full handover information is delivered to the Client (including CE certification for all installations separately and CE certification for the whole system).</Text></Spec>